Non-ferrous metal concentrator design process - dehydration

A beneficiation plant located in cold regions or when the moisture content of the concentrate smelting requires less than 8%, the dehydration process may be employed three sections. When the water content of the concentrate is 8% to 12%, a two-stage dewatering process should be used. When the water content of the concentrate is greater than 12%, a two-stage or one-stage dewatering process should be used.

2 In the premise of complying with the requirements of Article 1 of this code, when the area where the concentrator is located is long in winter and the climate is cold, for the easy-to-filter concentrate, the three-stage dehydration process in summer in summer can be used.

The coarse ore concentrate produced by the three re-election and magnetic separation operations can be dewatered by a sedimentation tank, a dewatering sieve, a centrifugal dewatering machine, a dewatering tank or a filter.

When 4 water-deficient areas, poor water supply conditions or increased tailings transport concentration, the tailings should adopt a concentrator process. When dry tailing of tailings is required. The tailings should be concentrated and filtered for two stages of dehydration.

Use 3

Ready-mixed Concrete Mixing Plants

HZS series concrete mixing station is a complete automatic concrete mixing equipment consisting of batching, mixing, electric control system and powder system. It has high-precision microcomputer control system and is equipped with separate manual control. It has ratio storage and automatic compensation drop. With a printing system, it can automatically complete the scheduled production.

Large Capacity Js Concrete Mixer,Js Concrete Mixer,Automatic Cement Concrete Mixer,Ready Mixed Concrete Mixer Machine

Shandong Zeyu Heavy Industry Science and Technology Co.,Ltd. , https://www.sdstabilizedsoilmixingplant.com