Xigong Worker's Compression Station Docking Garbage Truck Operation Method

Xigong Chusheng Docking Garbage Truck is a special vehicle used for garbage transfer and unloading in urban garbage compression stations. The box body of the vehicle adopts the high-quality carbon steel plate sealed and welded structure, which has the advantages of high strength, light weight, and no secondary pollution. The following is the method of operation of garbage collectors of Xiagong Chusheng.


Before loading the garbage, when the no-load operation reaches 6 standard air pressure, hang the power take-off device (bottom left of the steering wheel in the cab) and check whether there is any leakage or abnormality in each component, and then operate according to the position indicated by the operation signboard; The steps are as follows:


1. Docking garbage loading: push the rear door operating handle to the open position, and the wall cylinders on the left and right sides of the box are extended so that the rear door of the box is first pushed out horizontally for a certain distance, and is turned up and opened, releasing the operating handle to make it back To the median. After the rear door is opened, the garbage truck is docked with the compression box door, and the garbage is pushed horizontally into the carriage from the compression box. After the garbage is loaded, the garbage truck is released from the docking state and the rear door operation handle is pushed to the closed position. The cylinders on both sides of the wall are retracted, the rear door is turned downwards, and finally the rear door is horizontally pulled back tightly, releasing the operating handle to return it to the neutral position.


Second, butt-type refuse dump: When the vehicle reaches 6 standard air pressures, the power take-off device is hung. After checking whether there are any leaks or abnormalities in each component, operate according to the position indicated by the operation signboard. Push the rear door operating handle to the open position, and the wallboard cylinders on the left and right sides of the box are extended, so that the rear door of the box is first pushed out horizontally for a certain distance and then turned up and opened; releasing the operating handle to the neutral position. Push the handle of the dumping operation to the raised position, the self-unloading cylinder extends, the garbage box body rotates around the turning shaft, the garbage box forms a dumping angle, the garbage is discharged from the box body, and the dumping operation handle is released to return it Median;


3. After the docking garbage is unloaded, the dump handle is pushed to the falling position, the dump cylinder is retracted, the garbage box is rotated around the turning shaft, the garbage box is put back on the attached frame, and the dump handle is released. It comes back to the middle. Push the rear door operating handle to the closed position, the wall cylinders on the left and right sides of the box are retracted, the rear door is turned downwards, and finally the rear door is horizontally pulled back tightly, releasing the operating handle to return to the neutral position. Loosen the power take-off bin and place it. The vehicle can be driven.
Dongfeng pointed butt-type garbage truck

Heavy Duty Cut To Length Line

Heavy Duty Cut To Length Line make thick gauge steel plates, high tensile steel sheets(stainless steel coil sheets, high carbon steel coil sheets, high quality alloy steel sheets).

  • Thick gauge steel plates range thickness from 6mm and above, maximum can be 30mm, 40mm.
  • High tensile steel sheets will require same duty cut to length line when the sheet thickness is only half of plain steel plate.
  • The heavy duty cut to length don't only deal with high strength, but also conquer material elasticity.
  • Coils weight usually up to 20T, 30T, even 40T, huge coils.
  • The leveler of heavy duty cut to length line will be 4high, with leveling rollers and backup rollers.
  • cut to length sheets will be output to stacker, the stacker design will be speciall designed.
  • Heavy duty cut to length speed can be 20m/min encoding or 40-50m/min servo tracking.
  • The cut to length line will occupy 30m, 40m,50m length, when lengths of cut sheets vary.

Welcome you to consult, we will answer your inquiry in detail.

Heavy Duty Cut To Length Line

Heavy Duty Cut To Length Line,Heavy GI Coil Cut To Length,Heavy Duty Steel Cut To Length,Heavy Duty Cutting To Length

Wuxi Jinye Complete Set of Equipment Co.Ltd. , https://www.machinejinye.com