Hydraulic Assembly,High Precision Hydraulic Assembly,Hydraulic Lock High Precision,Hydraulic Safety Lock Huai'an Youbang Hydraulic Machinery Co., Ltd. , https://www.yb-hydraulic.com
Â
Advantage
Â
 1. Move easily & good mobility
 2. High efficiency
 3. Commercial Price.
Â
Application
Â
1. Drilling wells for urban and rural life
2. Drilling wells for agricultural irrigation and industries
3. Drilling for geotechnical survey
4. Drilling construction engineering holes
5. Drilling geothermal pump wells
Â
Picture for GL-III Truck Mounted Wayer well Drilling Rig
Â
Â
Technical ParameterÂ
Â
Drilling Parameter
Hole diameter:
120--1500(mm)
Hole depth:
350(m)
Run Of Rod:
3,4(m)
Drill rod diameter:
φ73 φ89 φ95 φ133(mm)
Drilling Technology:
Normaland Reverse Circulation for both Mud and Air
Down-The-Hole hammers:
Middle-High-Pressure Air
Performance parameter
Drill Head Inside Diameter:
φ80 φ120
Drill Head lifting Force(kN):
130
Drill Head Spin Speed:
A(Forward:20-33-73,Reverse:13-23-47r/min)
B(Forward:41-66-146,Reverse:26-43-94r/min) B(Forward:36-58-127,Reverse:23-37-80r/min) Shape Parameters
Dimensions:
(L-W-H) Working conditions 9600×2950×7900(mm)
Transport status:
(L-W-H) 10200×2470×3300(mm)
Supporting Form:
Hydraulic Unit
Mast Up-Down:
Hydraulic Unit
Rig mass:
12500(Kg)
Chassis:
Dongfeng EQ 1141/JiefangCA1127 (four-wheel drive)
Power Unit:
Diesel Engine
Power:
84(kW)
Pump:
BW600/30 Mud Pump
Flow(m³/h):
720Â 513Â 335
Pressure(MP):
3Â 4Â 5
Main Hoist Lifting Force:
25(kN)
Auxiliary Hoist Lifting Force:
8(kN)
Notes: Drill head spin speed can be selected, A is normal
Â
 Our Services
Delivery Time: Based on order quantity, normally it takes 30 days for production.Only 2 or 3 days if we have stock on your request size.
Quality Control: We have our professional QC and all the products will be strict inspection and testing for every order before shipping out.Â
After Services: Technical Support will be available in any time. We could provide the professional suggestion for you.
EX: 1.Select the right most suitable products.
    2. According to the rock types, choosing the face type, button tooth type.
    3. According to the different purpose,. choosing the different body typeÂ
Â
Our CompanyÂ
Â
Glorytek Industry (Beijing)Co.,Ltd., located inBeijing,China, is an integrated corporation specialized in manufacturing and exporting top quality drilling equipment and drilling parts for decades. We are supported and assisted by a highly experienced team of designers and engineers that enable us to complete all the assigned projects successfully as per the specified requirement from our clients.
Â
Our products are widely used in the scope of mining, water well drilling and exploration, anchor grouting project, side slope protection engineering, oil and gas engineering,underwater rock drilling & blasting operations of seaport channel, hydropower project, national defense projects ect. Â
Truck Mounted Water Well Drilling Rig(GL-III)
Â
Advantage
Â
 1. Move easily & good mobility
 2. High efficiency
 3. Commercial Price.
Â
Application
Â
1. Drilling wells for urban and rural life
2. Drilling wells for agricultural irrigation and industries
3. Drilling for geotechnical survey
4. Drilling construction engineering holes
5. Drilling geothermal pump wells
Â
Picture for GL-III Truck Mounted Wayer well Drilling Rig
Â
Â
Technical ParameterÂ
Â
Drilling Parameter
Hole diameter:
120--1500(mm)
Hole depth:
350(m)
Run Of Rod:
3,4(m)
Drill rod diameter:
φ73 φ89 φ95 φ133(mm)
Drilling Technology:
Normaland Reverse Circulation for both Mud and Air
Down-The-Hole hammers:
Middle-High-Pressure Air
Performance parameter
Drill Head Inside Diameter:
φ80 φ120
Drill Head lifting Force(kN):
130
Drill Head Spin Speed:
A(Forward:20-33-73,Reverse:13-23-47r/min)
B(Forward:41-66-146,Reverse:26-43-94r/min) B(Forward:36-58-127,Reverse:23-37-80r/min) Shape Parameters
Dimensions:
(L-W-H) Working conditions 9600×2950×7900(mm)
Transport status:
(L-W-H) 10200×2470×3300(mm)
Supporting Form:
Hydraulic Unit
Mast Up-Down:
Hydraulic Unit
Rig mass:
12500(Kg)
Chassis:
Dongfeng EQ 1141/JiefangCA1127 (four-wheel drive)
Power Unit:
Diesel Engine
Power:
84(kW)
Pump:
BW600/30 Mud Pump
Flow(m³/h):
720Â 513Â 335
Pressure(MP):
3Â 4Â 5
Main Hoist Lifting Force:
25(kN)
Auxiliary Hoist Lifting Force:
8(kN)
Notes: Drill head spin speed can be selected, A is normal
Â
 Our Services
Delivery Time: Based on order quantity, normally it takes 30 days for production.Only 2 or 3 days if we have stock on your request size.
Quality Control: We have our professional QC and all the products will be strict inspection and testing for every order before shipping out.Â
After Services: Technical Support will be available in any time. We could provide the professional suggestion for you.
EX: 1.Select the right most suitable products.
    2. According to the rock types, choosing the face type, button tooth type.
    3. According to the different purpose,. choosing the different body typeÂ
Â
Our CompanyÂ
Â
Glorytek Industry (Beijing)Co.,Ltd., located inBeijing,China, is an integrated corporation specialized in manufacturing and exporting top quality drilling equipment and drilling parts for decades. We are supported and assisted by a highly experienced team of designers and engineers that enable us to complete all the assigned projects successfully as per the specified requirement from our clients.
Â
Our products are widely used in the scope of mining, water well drilling and exploration, anchor grouting project, side slope protection engineering, oil and gas engineering,underwater rock drilling & blasting operations of seaport channel, hydropower project, national defense projects ect. Â
Truck Mounted Water Well Drilling Rig (GL-III)
Model NO.: GL-III
Type: Truck Mounted Type
Hole Diameter: 120--1500(mm)
Hole Depth: 350(M)
Run of Rod: 3--4(M)
Drill Head Lifting Force(Kn): 130
Dimensions(L-W-H) Working: 9600*2950*7900(mm)
Transport Status (L-W-H): 10200*2470*3300(mm)
Supporting Form: Hydraulic Unit
Rig Mass: 12500(Kg)
Usage: Water Well
Power Type: Diesel
Trademark: GLORYTEK
Transport Package: Sea Worthy Packing.
Origin: Beijing, China
Model NO.: GL-III
Type: Truck Mounted Type
Hole Diameter: 120--1500(mm)
Hole Depth: 350(M)
Run of Rod: 3--4(M)
Drill Head Lifting Force(Kn): 130
Dimensions(L-W-H) Working: 9600*2950*7900(mm)
Transport Status (L-W-H): 10200*2470*3300(mm)
Supporting Form: Hydraulic Unit
Rig Mass: 12500(Kg)
Usage: Water Well
Power Type: Diesel
Trademark: GLORYTEK
Transport Package: Sea Worthy Packing.
Origin: Beijing, China
Truck Mounted Water Well Drilling Rig(GL-III)