Die Casting Mould,Die Cast Mold,Die Casting Mould Parts Ningbo Beilun Huari Metal Products Co., Ltd. , http://www.huari-metal.com
Specification:
Part Material: PC/PP/PBT/ABS/PMMA/PU/PE/PVC
Core &Cavity Steel: P20/H13//GS2344/NAK80/ASSAB718HASSAB8407
Mold Base Steel: P20/1050/S50C/
Runner: Hot or Cold
Gate Type: Sprue Gate/Pin Point Gate/Edge Gate/Submarine Gate/Fan Gate/Ring Gate
Cavity No: Single or Multiple.
Mold Base Standard: DME/LKM/HASCO/Etc.
Spare Parts Standard: DME/HASCO/DAIDO/MISUMI/Customized is acceptable.
Mold Life: 30k-1, 000 k
Cycle Time: 10-120 s
Lead Time: 30-45 days
Injection Machine: 50-1600 Ton
Advantage:
High quality & competitive price & professional skills.
In house strict quality control.
On time delivery.
All mold could be produced automatically
Offered Service:
Mold progress report and tooling schedule will be provided weekly.
The first testing sample for buyer's inspection and work out improvement requirements will be provided.
Mold testing video, 2D part drawing and 3D mold design before shipment will be provided.
Payment and Delivery
Payment: TT 50% in advance, Balance before shipment(Negotiable).
Delivery Time: 30-45 days
The information has been udated on 2017-06-30.
Plastic Injection Mould for Household Appliance
Model NO.: RTE-08080804
Standard: PUNCH
Customized: Yes
Mold Size: 350X400X320mm
Cycle Time: 35-45s
Manufacturing Time: 25-35 Days
Trademark: RootChina
Origin: Qingdao Shandong
Professional Plastic Injection Mould Manufacturer with about 10 years experience, specializing in Plastic Injection Mould with Cold&Hot Runner/Gas Assistant Mould/High Glossy Mould/2K Injection Mould/IML/Stack Mould.