Mercury deposit exploration engineering spacing

The current "mercury ore geological exploration" provides, for each type of exploration of the exploration project mercury pitch, the table below.

Mercury deposit exploration engineering spacing table

Exploration type

Exploration engineering spacing (m)

Class C

D pole

Exploration line spacing

Online engineering distance

Exploration line spacing

Online engineering distance

I

120

40

240

80

II

120~60

40~20

240~120

80~40

III

60~30

40~20

120~60

80~40

IV

60~30

20~10

120~60

40~20


Mercury ore is mostly distributed in strips. When the ratio of length to short axis of ore body is 5..1~10..1, it is better to use the exploration line method to arrange the project. The direction of the exploration line should be perpendicular to the long axis of the ore body. Exploration methods use drilling and pit exploration. When the deposit is of type I and II, the drilling is mainly for C+D, the type I is verified by tunnel inspection, and the type II is suitable for tunnel exploration. Type III and IV are drilled to match the tunnel to find the C+D level; when the C is graded, the type III is matched with a certain number of tunnels, and the type IV is drilled in the pit.

PVC Glue Tin Can With Brush

Tin can with brush for PVC glue

CHANGZHOU AVEC PACKING TECHNOLOGY CO., LTD , https://www.avecintl.com