Dongxiang Copper Mine Concentrator

I. Location: Located at 7km northeast of Dongxiang County in Jiangxi Province, there is highway and railway line from there 6.5km connected with the Zhejiang-Jiangxi Road.

Second, the history of plant: Dongxiang copper mine was founded in 1958, the former steel plant Dongxiang mining plant, copper ore found in the iron mining process. Only iron ore processing 1973, 1973 produced by the transferred non-ferrous metallurgical Nanchang Design Institute 2000t new processing plant, wherein the iron system 800t / d, Cu systems 1200t / d. After 1979, the iron production was completed and transferred to copper production. However, the mining conditions were poor, and the ore supply capacity could only reach 550t/d. A feasibility study for the development of the Western District is currently underway.

3. Ore characteristics: The mine is a comprehensive deposit of copper, iron, sulfur and tungsten mainly composed of medium and low temperature hydrothermal filling. There are 6 copper ore bodies and 5 sulphur bodies in the deposit. There are 4 iron ore bodies and 8 tungsten ore bodies. The spatial distribution of the ore body is tungsten, iron, secondary enriched copper and primary enriched copper from top to bottom.

The main ore types are Hui (plaque) copper pyrite, brass pyrite, and copper-containing colloidal pyrite.

The main copper minerals are chalcopyrite, porphyrite, chalcopyrite, followed by copper, cyanite, cuprite, cholesteric, azurite, beryllium ore, etc. Other metal minerals mainly include pyrite. , colloidal pyrite, followed by pyrite, hematite, limonite. The main gangue minerals are quartz, kaolin, pyrophyllite, chlorite, sericite, calcite, muscovite and small amounts of carbon-based mineral acid. The mineralized surrounding rocks mainly include sandstone , shale and sand shale, followed by granite porphyry, tectonic breccia and a small amount of sericite.

The physical properties of the ore are shown in Table 1, and the chemical properties are shown in Table 2.

Table 1 Physical properties of ore

Ore rock

Density (t/m 3 )

Loose density, t/m 3

Hardness (f)

Natural repose angle

ore

2.87~3.2

1.48~1.56

6-8

37° to 39°

rock

2.75

1.48~1.56

3~8

37° to 39°

Table 2 Ore image and chemical analysis

project

element

Raw ore

Concentrate

Tailings

Object

all bronze

1.28

17.46

0.275

Primary copper sulfide

0.382

5.39

0.045

Secondary copper sulfide

0.808

11.526

0.175

Copper oxide

0.090

0.544

0.055

Oxidation rate 7.03%

Multi-element analysis

Cu

1.28

17.46

0.275

S

10.08

39.33

8.13

Fe

22.42

34.89

22.07

Bi

0.055

0.24

0.042

CaO

0.512

0.151

0.693

MgO

0.368

0.151

0.477

SiO 2

45~50

3 to 5

47~52

Al 2 O 3

5~7

1 to 2

4~6

Ag(g/t)

5.8

61

3.4

Fourth, the production profile: non-stratified and pillar sublevel caving ore mining, ore because many faults, changes, unstable ore, pressed large, difficult underground mining, mineral processing plant feed ore plurality Haney, The water content is high and the grades fluctuate greatly. Therefore, the production of the plant is relatively passive.

Since the launch of the production, the design institute and the mine have done a lot of transformation work. In recent years, the production has become more stable, the process is basically smooth, and the equipment accidents are reduced. Generally, the daily processing capacity of 600t/d can be guaranteed. If it is required to reach 1000t/d or higher. Capacity must be further updated. At present, the crushing production capacity is 100t/h, the crushing particle size is 20~25mm, and the two crushing systems are rotated. In order to make the final crushing particle size reach -15mm, we will now change the secondary washing and crushing into two washing and three-stage crushing. , add a Φ1520 hydraulic cone crusher . The capacity of grinding time is generally less than 25t. Due to the coarse grain size, the over-grinding and under-grinding phenomena are serious. In order to adapt to the ore properties, it is proposed to change one section of grinding to two-stage grinding (rough grinding and re-grinding). Grinding or refining and grinding). Priority flotation converts a rough selection operation to a butyl ammonium black drug to improve the concentrate grade.

The final product of the mine is copper concentrate, sulfur concentrate, and silver can reach the pricing standard in copper concentrate. The copper concentrate is sold to the Guixi smelting plant of the company, and the users of the sulfur concentrate are changeable. The province and the provinces of Zhejiang, Hubei and Ning have sales points.

V. Process: The production process of Dongxiang Copper Mine is shown in the following figure.

Figure Dongxiang Copper Mine Plant Production Process

If the chart is unclear, you can call it for free.

Production indicators: See Table 3.

Table 3 Main production indicators of Dongxiang Copper Mine Concentrator

project

unit

design

Best level of history

1980

1981

1982

1983

1984

1985

1986

1987

Processing of ore

t/d

10,000 tons / year

1000

33

558.9

18.61

421

12.28

433

13.03

356

10.13

450

15.35

527

17.71

558.9

18.61

18.8

19.789

Raw ore grade

Cu %

S %

1.58

10.9

1.57

9.67

1.42

9.67

1.05

7.82

1.57

8.10

1.32

7.79

1.23

8.28

1.32

9.14

1.871

8.91

1.898

30.45

Concentrate grade

Cu %

S %

15

35

24.50

41.30

21.39

42.30

20.14

37.43

24.50

36.65

23.86

29.20

20.69

27.64

21.60

40.66

22.29

39.22

21.85

36.55

Concentrate content

Cu t/y

S t/y

0.585

0.216

0.159

0.123

0.155

0.181

0.188

0.216

0.3013

0.4864

0.3279

8.1778

Recovery rate

Cu %

S %

93

67.47

91.15

35.83

91.15

90.13

28.09

88.60

30.00

90.88

35.65

87.63

35.83

88.70

30.07

89.02

30.33

88.69

35.98

7. Consumption indicators: See Table 4.

Table 4 Main material consumption of the concentrator

project

unit

1980

1981

1982

1983

1984

1985

Yellow medicine

k/t

100

135

155

197

121

139

Butyl ammonium

k/t

14.3

18.3

2 #æ²¹

k/t

100

112

138

107

90

101

lime

Kg/t

10.5

12.9

9.7

10.4

14.6

11.7

Steel ball

Kg/t

1.44

1.60

1.43

1.45

1.87

2.07

salary

m 3 /t

7.7

5.5

6.0

7.5

2.8

3.8

Electricity

The whole plant

°/t

41.6

41.7

43.5

47.0

46.3

44

Grinding

°/t

36.5

Eight, the main equipment capacity: see Table 5.

Table 5 Main equipment capacity of the concentrator

project

Name and specification

Number of units

Maximum throughput

First, broken mine

t/h·台

Product size, mm

Width of the mouth, mm

Ore loose density

Coarse

Jaw Crusher 600×900

2

130

≤130

80

1.8

Broken

Hydraulic cone crusher Φ1750

1

160

≤30

16

Finely broken

Second, grinding classification

Feeding particle size, mm

Grinding fineness, -200 mesh%

general

Lattice type ball mill Φ2700, Φ2100

3

26.5

80% ≤ 2.5

40

Double spiral classifier Φ2000, Φ1500

2

1

26.5

90% ≤ 2

60~65

Third, flotation

m 3 /t·d

Working concentration

Feeding particle size, mm

Copper selection

6A flotation machine 2.8m 3

36

0.2

25% to 28%

≤0.15

Fourth, dehydration

t/m 2 ·d

Feed concentration%

Mine concentration%

Concentrate density

concentrate

Center drive concentrator Φ18000

1

0.76

50~60

4.4

filter

Disc filter 27m 2

2

0.3t/m 2 ·h

55

88

4.4

Nine, the cost of mineral processing: see Table 6.

Table 6 Dressing production costs

Serial number

project

Unit consumption

unit price

Amount (yuan/ton)

1

Main material

Steel ball

Lining plate

Ding Huang Yao

Butyl ammonium black medicine

2# oil

lime

Sodium sulfide

Motor oil

conveyor belt

Filter cloth

Kg/t

2.07

0.029

0.0958

0.018

0.101

11.70

0.10

0.185

0.00153m 2

0.01m 2

0.865

2.00

3.00

5.50

3.00

0.045

0.66

1.85

110.0

6.50

1.79

0.058

0.287

0.099

0.303

0.53

0.066

0.292

0.168

0.065

2

Auxiliary material

1.26

3

salary

3.84m3

0.10

0.384

4

Electricity

44.04°

0.09

3.693

5

Production worker wages

0.97

6

Production worker additional wage

0.10

7

Depreciation of fixed assets

2.15

8

Overhaul fund

1.29

9

Workshop funding

0.373

Mineral processing unit cost

14.15

Concentrate unit cost

924.05

X. Equipment load rate: The equipment load rate and operation rate of the main workshop of Dongxiang Copper Mine Plant are shown in Table 7.

Table 7 Main workshop and equipment load rate and operation rate

Workshop name

Comprehensive production capacity (rated)

Load factor%

Operating rate%

First, the crushing workshop

1000t/d

64.0

65.0

Medium crusher

Fine crusher

Second, grinding and floating workshop

1000t/d

Grinding machine

Flotation machine

1.22t/m 3 ·h (calculated by newborn -200 mesh)

6.6t/m 3 ·h

65.3

85.0

87.0

Third, dehydration workshop

Copper 60t/d

Sulfur 90t/d

Filter

Copper 0.123t/m 2 ·h

Sulfur 0.185t/m 2 ·h

50.0

50.0

75.0

75.0

XI. Tailings facilities: There are bird stone source, Dongtangyuan and Yayuanlong in the tailings storage of the plant. The storage capacity is 2 million m 3 , 1.4 million m 3 and 4.48 million m 3 respectively . Now we use the bird source library, the maximum storage capacity is up to 3.2 million m 3 , and the storage capacity is now 1.2 million m 3 . According to the processing capacity of 200,000 t / y, it can also serve 11 years. The investment is 8.292 million yuan.

The tailings reservoir dam is a homogeneous earth dam with an outer slope of 1:3, a dam height of 15m and a dam length of 150m. The dam is artificially stacked with a 1:5 slope in the tailings deposited in front of the dam. With loess, the production of underground waste rock is used.

The tailings are sent to the collecting well with a Waman pump at a time, with an elevation of 70m and a length of 345m, and then flow from the open channel to the tailings dam head. The concentration of tailings is 15%-20%, and it is discharged by dispersing pipes. The coarse and fine grains are naturally graded, and the annual discharge is about 90 to 1 million tons. The tailings backwater is pumped to the plant at an absolute elevation of 93m or less. Above this elevation, it flows through the overflow well to a tunnel with a section of about 2m 2 to the plant. The return water usage is above 50%. The discharge channel is discharged.

The underground acidic water containing Cu ++ greater than 50mg/L is sent to the replacement tank, the sponge copper is recovered, the replacement tail water and the low Cu ++ acidic water are sent to the tailings pond to neutralize the tailings water to prevent calcium formation in the pipeline.

Twelve, the investment effect: the total investment of the enterprise is 48.23 million yuan, and the investment in the mineral processing part is 23.57 million yuan. The original value of fixed assets of the enterprise was 40.42 million yuan and the net value was 34.77 million yuan. The main benefit indicators of the concentrator are shown in Table 8.

Table 8 Main Benefit Indicators of Concentrators

Full labor productivity (t/d·person)

2.62 (1985)

Labor productivity (t/d·person)

3.00 (1985)

Installed power per ton of raw ore (kW/t·d)

Total number of employees

215

Of which: workers

Technical staff

Service staff and others

186

12

17

Comprehensive use:

Associated metal content

Recycled metal

Ag5.8 k/t

Copper concentrate contains Ag 61g/t